Starting the operation

Starting the operation

  • To start the operation choose the correct control station from the main switch.

Control stations

  • Lower controls:
    • Boom operation.
  • Remote control:
    • Driving the lift.
    • Outrigger operation.
  • Upper controls:
    • Boom operation.
    • Driving the lift.
    • Outrigger operation.

Automatic leveling

  • Effortlessly levels the lift even on steep slopes.
  • Push the lower button to activate.
  • Push the upper button to raise the outriggers.
  • Hold the upper button to raise all outriggers to transport position.